For semiconductor and advanced-packaging teams
Die, bump, and substrate inspection with per-unit traceable evidence.
See tiny defects become traceable yield-risk evidence without burying engineers in screenshots.
diebumptraceRisk Review · review required
From factory signal to audit-ready record
Human-controlled
System preparedHuman approval requiredNo automatic release
Where teams usually start
- Die-attach / placement verification
- Bump / interconnect inspection
- Substrate marking & OCR check
Example part & rule
Example part Populated PCB
Reject a solder bridge above 0.25 mm in a critical region.
measured 0.4 mmlimit 0.25 mm
REJECTsolder bridgemissing componenttombstonemarking error
Discovery questions for the conversation
- Where does your current AOI or metrology coverage stop?
- Which packaging defects escape to final test today?
- What per-unit traceability do your customers require?
Which inspection station should we map first?
The goal is to identify one station where this could matter — then validate with your approved parts and criteria.
Build the pilot planThis is an example workflow for semiconductor & advanced packagingteams — a hypothesis, not a claim about any specific company's process.
Demo scenes are illustrative and use deterministic product scenarios. Regulated decisions remain human-controlled.