Industrial Fittings
Defensible reject evidence ends the supplier dispute argument.
Signature inspection rule
coating blemishOver limit → reject
measured 1.4 mmlimit 1 mm
critical region · outer bodyReject a coating blemish above 1 mm in outer body → this run sealed REJECT.
Defect families
coating blemishpitrustthread damage
Sample part
Coated pipe fittingFirst pilot: Outgoing visual / coating inspectionToday's pain
Coating / surface defectsSupplier disputesManual variationSlow root cause
Evidence need
Defensible reject evidence for supplier disputes.
Recommended: surfacecell