Skip to content
HoldField
← Demo console

For electronics and EMS box-build teams

Box-build and assembly inspection with marking/OCR evidence.

An evidence layer that extends AOI: box-build, assembly, label, and marking verification with per-unit replayable records.

Run the live inspection cycleBuild a station fit report

Electronics / EMS Box-Build inspection-to-evidence story

  1. Step 1: the Electronics / EMS Box-Build inspection cell is running.
  2. Step 2: inspection identifies assembly/marking error past aoi.
  3. Step 3: sealed evidence: serial · marking · assembly state.
  4. Step 4: a CAPA draft is prepared — capa recommendation prepared on the defect cluster.
  5. Step 5: human approval is required before any decision; nothing is released or closed automatically.
  6. Step 6: per-unit replayable evidence ready to export.

From factory signal to audit-ready record

Human-controlled
System preparedHuman approval requiredNo automatic release

Where teams usually start

  1. Box-build final inspection
  2. Label / marking verification
  3. Assembly completeness check

Example part & rule

Example part Populated PCB

Reject a solder bridge above 0.25 mm in a critical region.

measured 0.4 mmlimit 0.25 mm
REJECT
solder bridgemissing componenttombstonemarking error

Discovery questions for the conversation

Which inspection station should we map first?

The goal is to identify one station where this could matter — then validate with your approved parts and criteria.

Build the deployment plan

This is an example workflow for electronics / ems box-buildteams — a hypothesis, not a claim about any specific company's process.

Demo scenes are illustrative and use deterministic product scenarios. Regulated decisions remain human-controlled.